期刊文献+

考虑延迟交货的C2M订单接受决策 被引量:1

C2M Order Acceptance Decision Considering Late Delivery
下载PDF
导出
摘要 以C2M加工装配型制造商在产能约束情形下的订单接受决策问题为研究对象,探讨不同延迟交货率对订单利润的影响。运用约束理论和0-1整数规划法,将企业产能、订单利润、交货期、延迟交货率与订单接受决策相结合,建立了基于产能约束的订单接受决策模型,讨论不同延迟交货率对订单利润的影响;以实现订单利润最大化为目标,通过算例分析对得到的结果进行验证。研究表明,设置适当水平的延迟交货率可以实现订单利润最大化。研究成果可为C2M条件下制造商优化生产管理、完善C2M订单生产决策提供参考。 In this paper,taking the order acceptance decision-making of a C2M processing and assembly type manufacturer under capacity constraint as the subject,we explored the impact of different late delivery rates on order margin.Using the constraint theory and the 0-1 integer programming method,we combined enterprise capacity,order margin,delivery time,and late delivery rate with the decisionmaking on order acceptance,and established the order acceptance decision-making model with capacity constraint to discuss how the different late delivery rates affect order margin.Next,with maximizing order margin as the objective,we verified the results obtained through a numerical example.The study has shown that setting an appropriate level of late delivery rate could maximize order margin.
作者 张亚洲 徐章一 Zhang Yazhou;Xu Zhangyi(School of Logistics Engineering,Wuhan University of Technology,Wuhan 430063,China)
出处 《物流技术》 2020年第4期48-52,共5页 Logistics Technology
关键词 订单接受 延迟交货率 0-1整数规划 C2M订单 产能约束 order acceptance late delivery rate 0-1 integer programming C2M order capacity constraint
  • 相关文献

参考文献8

二级参考文献54

  • 1李德毅,孟海军,史雪梅.隶属云和隶属云发生器[J].计算机研究与发展,1995,32(6):15-20. 被引量:1259
  • 2吴春辉,周水银.并行多机加权成套订单数极大化的混合遗传算法[J].系统工程理论与实践,2006,26(11):125-129. 被引量:5
  • 3Yano C. Setting planned lead times in serial production systems with tardiness costs [J]. Management science, 1987,33 (1) : 95-106. 被引量:1
  • 4Reitaman D. Endoggenous quality differentiation in congested markets[J].J. of Industrial Econnomics, 1991,39 : 621-647. 被引量:1
  • 5Moorthy S, Srinivasan K. Signaling quality with a money-back guarantee: The role of transaction costs [J]. Marketing Science, 1995,14(4) : 442-466. 被引量:1
  • 6Ray S,Jewkes E M. Customer lead time management when both demand and price are lead time sensitive [J]. European Journal of Operational Research, 2004, (153) :769-781. 被引量:1
  • 7Izak D, Hopp W J. Quoting customer lead times[J]. Management Science, 1995,41 (1) : 43-57. 被引量:1
  • 8Weng Z K. Manufacturing lead times, system utilizatin rates and lea&time-related demand[J]. European Journal of Operational Research, 1996,89: 259-268. 被引量:1
  • 9Easton F F, Moodie D R. Pricing and lead time decisions for make-to-order firms with contingent orders[J]. European Journal of Operational Research, 1999,116 : 305-318. 被引量:1
  • 10Elhafsi M,Rolland E. Negotiating price/delivery date in a stochastic manufacturing environment [J]. IIE Transactions, 1999,31: 255-270. 被引量:1

共引文献17

同被引文献10

引证文献1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部