摘要
针对超大面积多鱼塘清淤工程工程淤泥量大、施工面积广、施工工艺复杂、施工组织协调难度大等诸多特点,本文根据九江芳兰湖生态公园清淤工程,对大面积多鱼塘清淤施工技术进行了深入研究,提出了切实可行的解决方案。
In view of the characteristics of large silt volume,wide construction area,complex construction process,and difficulty in coordination of construction organization in the super large fish pond dredging project,based on the dredging project of the Jiujiang Fanglan Lake Ecological Park,this paper conducted an in-depth study on the dredging construction technology of large fish ponds,and put forward practical solutions.
作者
辛建宾
XIN Jian-bin(The Municipal Engineering Co.,Ltd.of CTCE Group,Hefei 230000,China)
出处
《价值工程》
2020年第12期146-148,共3页
Value Engineering
关键词
大面积
多鱼塘
清淤工程
施工技术
large area
fish pond
dredging project
construction technology