综放工作面巷道煤柱留设控制技术的探究

Technology of Small Coal Pillar Reservation in the Fully Mechanized Mining Face of Du’erping mine
下载PDF
导出
摘要 结合岳城煤矿1306工作面原煤柱留设尺寸较大浪费资源、底板和两帮变形严重、护巷效果差等现状,分析其煤柱失稳垮落是造成巷道变形的重要原因,通过理论计算、数值模拟和现场验证,确定了将煤柱从15 m改为6 m的留设方案,煤柱处于工作面侧向移动支承压力的应力降低区,在合理支护阻力下,能够保障煤柱在回采期间的稳定性。 Based on the present situation of large size of raw coal pillar, waste of resources,serious deformation of floor and two sides of roadway, the paper analyzes that the instability and collapse of coal pillar is the important cause of roadway deformation. Through theoretical calculation, numerical simulation and field verification, the retention scheme of changing coal pillar from 15 m to 6 m is determined. The coal pillar is in the lateral moving support of working face under the reasonable support resistance, the stress reduction area of pressure can guarantee the stability of coal pillar during mining.
作者 王伟 Wang Wei(Yuecheng Coal Mine of Qinxiu Company,Jincheng Shanxi 048006)
出处 《机械管理开发》 2020年第2期144-146,共3页 Mechanical Management and Development
关键词 煤柱留设 巷道失稳 应力分布 coal pillar reservation roadway instability stress distribution
  • 相关文献

参考文献1

二级参考文献2

共引文献18

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部