BIM技术在综合管廊顶管施工精准化管理中的应用 被引量:3

The Application of BIM Technology in the Accurate Management of Jacking Construction of Comprehensive Pipe Gallery
下载PDF
导出
摘要 以南京江北新区综合管廊J0-J5顶管施工段为例,在分析构件建模原理的基础上,研究了施工前期和过程中的BIM技术应用,结果表明,BIM技术的应用有利于打破信息断流、孤岛等现象[1],实现不同施工阶段工程信息的自由流动,提升顶管施工精准化管理水平。 Taking j0-j5 pipe jacking construction section of comprehensive pipe gallery in Jiangbei new area of Nanjing as an example,based on the analysis of the principle of component modeling,this paper studies the application of BIM Technology in the early stage and in the process of construction.The results show that the application of BIM Technology is conducive to breaking the phenomena of information disconnection and island isolation[1],realizing the free flow of engineering information in different construction stages,and improving the precise management level of pipe jacking construction.
作者 万磊 杜利鹏 Wan Lei;Du Lipeng(China Railway No.17 Bureau Group First Engineering Co.Ltd.,Qingdao,Shandong 266000;China Railway 17th Bureau Group Co.Ltd.,Taiyuan,Shandong 030006)
出处 《江西建材》 2020年第4期131-132,134,共3页 Jiangxi Building Materials
基金 山西省重点研发计划(201803D121117)。
关键词 BIM技术 顶管施工 精准化管理 BIM technology Jacking construction Precision management
  • 相关文献

参考文献3

二级参考文献20

  • 1张建平,曹铭,张洋.基于IFC标准和工程信息模型的建筑施工4D管理系统[J].工程力学,2005,22(S1):220-227. 被引量:109
  • 2房延懋.气压法大直径钢筋混凝土管长距离曲线顶管[J].水运工程,1994(10):70-74. 被引量:1
  • 3曹晓阳,李红兵.顶管施工用管材的比较和应用[J].中国给水排水,2006,22(4):47-47. 被引量:9
  • 4Eastman C,Teicholz P,Sacks R. BIM handbook[M].New Jersey:John Wiley and Sons,Inc,2010. 被引量:1
  • 5Yang D,Eastman C M. A rule-based subset generation method for product data models[J].Computer-Aided Civil and Infrastructure Engineering,2007,(02):133-148.doi:10.1111/j.1467-8667.2006.00476.x. 被引量:1
  • 6Singh V,Gu N,Wang X. A theoretical framework of a BIMbased multi-disciplinary collaboration platform[J].Automation in Construction,2011,(02):134-144. 被引量:1
  • 7Liu Qiang,Zhang Jianping,Li Ding. Research of building information modeling and model transformation technology based on the IFC[A].2012. 被引量:1
  • 8Zhang Jianping,Hu Zhenzhong. BIM-and-4D-based integrated solution of analysis and management for conflicts and structural safety prohlems during construction: 1 principles and methodologies[J].Automation in Construction,2011.155-166. 被引量:1
  • 9Hu Zhenzhong,Zhang Jianping. BIM-and-4D-based integrated solution of analysis and management for conflicts and structural safety problems during construction:2.development and site trials[J].Automation in Construction,2011.167-180. 被引量:1
  • 10Liang Xiong,Lu Ming,Zhang Jianping. Integration of as-built and as-designed models for positioning control during construction[J].Automation in Construction,2011,(03):234-246. 被引量:1

共引文献668

同被引文献5

引证文献3

二级引证文献3

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部