期刊文献+

基于TELEMAC-3D的水库低温水下泄河段水温恢复过程模拟预测研究 被引量:2

Simulation and Prediction of Water Temperature Recovery Process of Low Temperature Water Discharge in Reservoirs Based on TELEMAC-3D
下载PDF
导出
摘要 笔者以百色水利枢纽工程为例,运用TELEMAC-3D开源模拟系统模拟计算5月份百色水利枢纽工程下泄河段沿程的水温恢复情况,并结合不同断面实测数据进行了对比分析,研究结果说明该方法在下泄河段一定距离内具有较好的精确性,同时模拟结果具有较好的可视性,可以为水库下泄低温水的时空变化研究和水库运行管理提供一定的参考价值。 Water temperature prediction is one of the important research contents in the water environment impact of large reservoirs, which is of great significance for the sustainable development of water resources development and utilization. Taking Baise Hydro Project as an example, the authors use TELEMAC-3 D open source simulation system to simulate and calculate the water temperature recovery along the discharge reach of Baise Hydro Project in May, and make a comparative analysis based on the measured data of different sections. The research results show that the method has better accuracy within a certain distance of the discharge reach, and the simulation results have better visibility. It can provide some reference value for the study of temporal and spatial variation of low temperature water discharged from reservoirs and the operation and management of reservoirs.
作者 张海东 韦兵 安贺东 朱健 喻国良 ZHANG Haidong;WEI Bing;AN Hedong;ZHU Jian;YU Guoliang(Guangxi T-Energy Engineering Consulting Co.,Ltd.,Nanning,Guangxi,530023;State Key Laboratory of Ocean Engineering,Shanghai Jiao Tong University,Shanghai,200240)
出处 《红水河》 2020年第2期7-9,共3页 Hongshui River
关键词 TELEMAC-3D 低温水 水库 水温恢复 模拟 百色水利枢纽工程 TELEMAC-3D low temperature water reservoir water temperature recovery simulation Baise Hydro Project
  • 相关文献

参考文献6

二级参考文献40

共引文献39

同被引文献10

引证文献2

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部