西梁山水厂取水工程防洪影响及处理措施 被引量:2

Flood Influence on Water Intake Project of Xiliangshan Water Plant and Its Treatment Measures
下载PDF
导出
摘要 马鞍山西梁山水厂一期工程作为重要的供水工程,要求在工程建设时,必须把防洪、行洪当作重中之重。由于该供水工程水泵房及栈桥基础较深,在汛期高水头作用下,容易造成渗透破坏,造成泵房及栈桥基础位置河床冲刷。因此,为保护江堤防洪安全,针对现存问题采取防渗加固措施。通过运行观测,堤后渗透比降至允许范围。 As an important water supply project,the first-stage project of Xiliangshan water plant in Maanshan City is demanded for must placing flood control and flood releasing in top priority position.Because both the foundation of pump room and jetty are deep,during flood period,under the action of high water pressure,soil seepage damage easily takes place,resulting in river bed is scoured at the foundation of pump room and jetty.Therefore in order to guard the safety of river bank,seepage prevention and reinforcement measures were taken aiming at the problems exist.Through operation observation,the osmosis ratios at embankment back have reduced to allowable range.
作者 周金岩 谷霄鹏 Zhou Jinyan;Gu Xiaopeng
出处 《吉林水利》 2020年第4期54-55,59,共3页 Jilin Water Resources
关键词 渗透破坏 河床冲刷 岸坡稳定 处理措施 seepage damage river bed scouring bank slope stability treatment measures
  • 相关文献

参考文献2

  • 1薛明..桥涵水文[M],2002.
  • 2毛昶熙主编..渗流计算分析与控制[M].北京:中国水利水电出版社,2003:576.

同被引文献5

引证文献2

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部