期刊文献+

铜箔生产车间空调净化系统的运行与管理 被引量:2

Operation and Management of Air Conditioning Purification System in Copper Foil Workshop
下载PDF
导出
摘要 为了满足铜箔产品质量对生产作业环境的要求,耶兹铜箔有限公司在车间内安装空调净化系统,对车间的生产作业环境进行有效控制。简述了铜箔生产车间空调净化系统工艺介绍、工作原理以及其运行与管理。同时,在空调系统经过多年的使用后,发现节能等方面仍存在一些问题,通过对现场的现状进行分析,对空调系统的运行管理提出了一些优化改进措施。 In order to meet the requirements of the quality of copper foil products on the production environment,the air conditioning purification system is installed in the workshop to effectively control the production environment of the workshop.The technology,working principle,operation and management of air conditioning purification system in copper foil workshop are introduced briefly.At the same time,after years of use of the air conditioning system,it is found that there are still some problems in energy saving and other aspects.Through the analysis of the current situation on the site,some optimization and improvement measures are put forward for the operation management of the air conditioning system.
作者 李华 LI Hua(JCC-Yates Foil Co.,Ltd,Nanchang 330096,Jiangxi,China)
出处 《铜业工程》 CAS 2020年第1期101-104,共4页 Copper Engineering
关键词 铜箔生产车间 空调净化系统 工作原理 运行 管理 改进措施 copper foil workshop air conditioning purification system operational principle operation management improvment measure
  • 相关文献

参考文献5

二级参考文献49

  • 1杨颀,孟志强,彭永进.基于MAX1044和MAX485的RS232-RS485转换器[J].湖南大学学报(自然科学版),2002,29(S1):84-88. 被引量:5
  • 2刘燕敏,聂一新,张琳,涂舫.空调风系统的清洗对室内可吸入颗粒物和微生物的影响[J].暖通空调,2005,35(2):133-137. 被引量:33
  • 3刘燕敏,杨德林,涂舫.空调系统清洗引起的污染分析[J].洁净与空调技术,2005(2):52-53. 被引量:10
  • 4中国建筑科学研究院 中国建筑业协会建筑节能专业委员会.GB 50189-2005公共建筑节能设计标准[S].北京:中国建筑工业出版社,2005.. 被引量:18
  • 5Englander S L,Norford L K.Saving fan energy in VAV systems-part 2:supply fan control for static pressure minimization using DDC zone feedback[G]// ASHRAE Trans,1992,98 (1):19-32 被引量:1
  • 6California Energy Commission.Advanced variable air volume system design guide[EB/OL].http://www.energy.ca.gov/reports/2003-11-17_500-03-082_A-11.PDF 被引量:1
  • 7Tung S L,Deng Shiming.Variable-air-volume airconditioning system under reduced static pressure control[J].Building Services Engineering Research & Technology,1997,18(2):77-83 被引量:1
  • 8Wang Shengwei,Burnett J.Variable-air-volume airconditioning systems:optimal reset of static pressure set point[J].Building Services Engineering Research & Technology,1998,19(4):219-231 被引量:1
  • 9Hartman T.TRAV-a new HVAC concept[J].Heating,Piping & Air Conditioning,1989,61 (7):69-73 被引量:1
  • 10Byers T.VAV system:fan pressure optimization[J].TAB Journal,2002:21 被引量:1

共引文献32

同被引文献7

引证文献2

二级引证文献1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部