深厚黏土层冻结井筒冻结壁径向位移分析 被引量:2

Analysis on Radial Displacement of Freezing Wall in Mine Freezing Shaft in Deep Thick Clay
下载PDF
导出
摘要 赵固二矿西风井采用冻结法施工,穿过704.6 m深厚黏土层,冻结管断裂风险较大。井筒掘砌过程中,对冻结壁径向位移进行了实测,并兼顾其他影响因素。结果显示,70个位移监测层位中,共有57%的监测层位位移超过50 mm警戒值。 The west ventilation shaft of Zhaogu No.2 Mine was constructed with a ground freezing method.The mine shaft was passed through deep thick clay with a thickness of 704.6 m.The freezing pipe had a high broken risk.During the mine shaft lining processing,a site measurement was conducted on the radial displacement of the freezing wall in the mine shaft and the other influence factors were considered.The results showed that in 70 displacement measuring layers,the displacements of the 57%measuring layers were over the warning value of 50 mm.
作者 王恒 赵玉明 李晓伟 WANG Heng;ZHAO Yuming;LI Xiaowei(Beijing China Coal Mine Engineering Company Limited,Beijing 100013,China;Henan Guolong Mine Construction Company Limited,Zhengzhou 450000,China)
出处 《建井技术》 2019年第6期20-23,共4页 Mine Construction Technology
关键词 深厚黏土层 冻结壁 径向位移 冻结管断裂 deep thick clay freezing wall radial displacement freezing pipe broken
  • 相关文献

参考文献8

二级参考文献12

共引文献15

同被引文献23

引证文献2

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部