期刊文献+

基于机组组合约束模型的阶段电源扩展规划

Phase Power Expansion Planning Based on Unit Combination Constraint Model
下载PDF
导出
摘要 以2019年为基准,本文根据给定的系统机组的电气参数、经济性参数,首先基于电力系统技术性指标对机组负荷、出力、容量规划分析,接着对机组的功率平衡、系统旋转备用约束、机组出力上下限等方面进行约束;最后建立机组组合约束模型以机组投资费用为目标函数进行求解,对2030年进行电源扩展规划。 Based on 2019,this paper first analyzes the unit load,output,and capacity planning based on the technical indicators of the power system based on the electrical parameters and economic parameters of the given system units,and then constrains the unit's power balance,system rotation reserve constraints,unit output upper and lower limits,etc.Fnally,a unit combination constraint model was set up to solve the unit investment cost as an objective function,and power expansion planning was planned for 2030.
作者 赵梵喆 林跃 杨永琪 ZHAO Fan-zhe;LIN Yue;YANG Yong-qi(Shandong University of Science and Technology,Ji'nan 250031,China)
机构地区 山东科技大学
出处 《价值工程》 2020年第9期254-255,共2页 Value Engineering
关键词 机组组合约束模型 目标规划 电源规划 unit combination constraint model target planning power planning
  • 相关文献

参考文献3

二级参考文献7

共引文献6

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部