摘要 本文以桐子林水电站二期上游围堰左堰肩处覆盖层灌浆工程为例,对深厚覆盖层灌浆试验展开了研究,通过试验结果分析,确定了一套科学、高效的施工工艺,保证了施工方案满足工程质量和进度的要求,为厂房基坑提供了干地施工条件。 The overburden layer grouting project of Tongzilin Hydropower Station stage II upstream cofferdam left dam shoulder is adopted as an example in the paper.The grouting test of the overburden layer is studied.The test results show that a set of scientific and efficient construction technology is determined,thereby ensuring that the construction plan can meet the requirements of the project quality and schedule,and providing factory building foundation pit construction with dry land construction conditions.
作者 张杰 漆巨彬 ZHANG Jie;QI Jubin(Sinohydro Bureau 7 Co.,Ltd.,Chengdu 611130,China)
出处 《水利建设与管理》 2020年第3期58-62,84,共6页 Water Conservancy Construction and Management
关键词 深孔 覆盖层 灌浆试验 应用 deep hole overburden layer grouting test application
  • 相关文献

参考文献1

  • 1《水利水电工程施工手册》编委会编,夏可风主编..水利水电工程施工手册 第1卷 地基与基础工程[M].北京:中国电力出版社,2004:717.

同被引文献53

引证文献5

二级引证文献11

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部