期刊文献+

某化工厂炭材料生产线升级改造项目实例分析

Case Analysis of Upgrading and Transformation Project of Carbon Material Production Line in a Chemical Plant
下载PDF
导出
摘要 受益于新能源产业的发展,中国负极材料整体产量呈逐年增长趋势。本项目正是在这样的背景下,对原有炭材料生产线进行升级改造,由于原有生产技术从日本引进,因此在项目升级改造过程中遇到诸多技改类问题,本文主要从施工角度进行总结分析,并提出相应的对策建议,为相似项目施工提供参考。 Benefiting from the development of new energy industry,the overall output of negative electrode materials in China is increasing year by year.Under such background,the project upgrades the original carbon material production line.As the original production technology is imported from Japan,many technical transformation problems are encountered in the upgrading process of the project.This paper mainly summarizes and analyzes from the perspective of construction,and puts forward corresponding countermeasures and suggestions to provide reference for similar project construction.
作者 张旭 Zhang Xu(MCC Baosteel Technical Service Co.,Ltd.,Shanghai,201900)
出处 《当代化工研究》 2020年第5期148-150,共3页 Modern Chemical Research
关键词 升级改造 项目建设 对策建议 upgrade project construction countermeasures and suggestions
  • 相关文献

参考文献4

二级参考文献10

共引文献2

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部