期刊文献+

“华龙一号”核岛重轻轨支承预埋件分析及控制

Analysis and Control of the Buried Parts for the Heavy and Light Rail Support of Fuqing Nuclear Power Plant
下载PDF
导出
摘要 文章通过对"华龙一号"5号机组核岛重轻轨的支承埋件的数据超差分析,并结合现场实际发生的案例,从设计和安装角度两个方面入手,分析了支承埋件超差的产生原因,针对支承埋件的设计和安装工艺两方面进行分析,从中总结经验,在6号机组进行了设计优化及风险控制且取得了良好的效果。 Through the data out-of-tolerance analysis of the supporting buried parts for the heavy and light rails of HPR1000 nuclear island,and combined with the actual cases on site,this paper analyzes the cause for data out-of-tolerance of the supporting buried parts,starting from the two aspects of design and installation,and the experience is summarized.The design optimization and risk control of Fuqing 6 are carried out and good results are obtained.
作者 许利民 蔡舒畅 XU Li-min;CAI Shu-chang(China Nuclear Power Engineering Co.,Ltd.,CNNC,Beijing 100840,China)
出处 《中国核电》 2019年第6期607-612,共6页 China Nuclear Power
关键词 “华龙一号” 重轻轨 埋件超差 预防措施 设计优化 HPR1000 heavy and light rails out-of-tolerance buried parts preventive measures design optimization
  • 相关文献

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部