介绍了三起水电站电流互感器二次参数不匹配案例,分析了电流互感器三个重要二次参数的含义及影响,介绍了设计手册和主要规范对水电站电流互感器二次参数选择的一些重点要求,通过计算总结出了水电站电流互感器二次参数的选择要点。
Three mismatch cases of secondary parameters of current transformer in hydropower station were introduced.The meaning and influence of three important secondary parameters of current transformer were analyzed.Some key requirements of design manual and main specifications for the selection of secondary parameters of current transformer in hydropower station were introduced.The selection points of secondary parameters for current transformer in hydropower station were summarized through calculation.