期刊文献+

铜冶炼电收尘灰浸出液与硫化砷渣综合处理工艺研究 被引量:7

Research on the comprehensive treatment process of the leaching solution of copper smelting electrostatic precipitator dust and arsenic sulfide slag
下载PDF
导出
摘要 介绍了一种铜冶炼电收尘灰酸浸液与硫化砷渣的联合处理工艺。确定了铜冶炼电收尘灰浸出液与硫化砷渣最佳反应条件为:加入硫酸铜量为理论铜与砷摩尔比1.1∶1,反应温度85℃,反应时间2 h,铜离子质量浓度15 g/L,初始硫酸质量浓度30 g/L。 A combined treatment process of acid leaching solution of electrostatic precipitator dust and arsenic sulfide slag in copper smelting is introduced. The optimum reaction conditions of the leaching solution of copper smelting electrostatic phecipitator dust and arsenic sulfide slag are determined as follows: the amount of copper sulfate added is 1.1 ∶ 1 of theoretical copper to arsenic molar ratio, the reaction temperature is 85 ℃, the reaction time is 2 hours, the mass concentration of copper ion is 15 g/L, and the mass concentration of initial suphuric acid is 30 g/L.
作者 王雷 WANG Lei(Shandong Humon Smelting Co.,Ltd.,Yantai,Shandong,264109,China)
出处 《硫酸工业》 CAS 2020年第1期36-40,共5页 Sulphuric Acid Industry
关键词 铜冶炼 电收尘灰 硫化砷 综合回收 copper smelting electrostatic precipitator dust arsenic sulfide comprehensive recovery
  • 相关文献

参考文献5

二级参考文献4

共引文献22

同被引文献64

引证文献7

二级引证文献9

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部