以某公司磷石膏堆场扩容改造项目为例,详细总结了环境监理工作的流程、内容及作用。在该项目监理过程中,环境监理项目部共计完成建设项目施工期环境保护知识培训1次,编制了《建设项目环境监理工作实施方案》1份、《建设项目设计环保符合性专项审查报告》1份、审查施工单位上报《环保专项施工组织设计》4份、《建设项目环境监理年度总结报告》1份、《建设项目环境监理工作月报》16期,签发环境监理函件2份、签发环境监理工作联系单3份、签发环境监理通知单9份,编制《建设项目施工期环境监理总结报告》1份。环境监理总监和环境监理工程师不定期进行现场巡视48次,并按甲方要求参加各种相关会议数次。为建设单位落实环评制度、竣工环保“三同时”验收和运营期生态环境保护工作提供了全过程技术咨询服务,减小了工程建设和运营的环境风险。
The project is a capacity expansion of the phosphogypsum yard.The paper summarized the work procedure and the content and the function of environmental supervision.During the construction,a third-party organization with technical qualification to carry out environmental supervision was hired to implement the“three simultaneous”acceptance and ecological protection.The third-party organization also organized the training for the workers about environmental protection knowledge,wrote a work plan of environmental supervision for this project,finished a compliance review report of environmental design,and completed four review reports of construction and organization and design of environmental protection.The organization wrote one yearly and one final summary report and 16 periods of monthly working report,signed two environmental supervision papers and three copies of working sheets and nine copies of environmental supervision notices.The supervision manager and engineers made 48 inspection tours and took part in all relevant meetings for its employer.The organization also provided the relevant whole process technological consultant for the construction party,which has effectively decreased environmental risks.
作者
李付周
夏冬青
LI FU-zhou;XIA DONG-qing(Yunnan Institute of Environmental Science,Kunming Yunnan 650034,China)
出处
《环境科学导刊》
2020年第1期53-58,共6页
Environmental Science Survey
关键词
施工期
环境监理
作用
磷石膏堆场
construction period
environmental supervision
role
phosphogypsum yard