期刊文献+

基于总成本费用模型的经济电流密度计算方法研究 被引量:2

Computing method for economic current density based on total cost expense model
下载PDF
导出
摘要 传统的计算方法未考虑线路检修费用、线路退役费用、电价、导线价格等重要参变量的时间价值,导致电流密度取值较大,为此,提出基于总成本费用综合评价模型的经济电流密度计算方法。将线路的总成本费用分为初次投入成本、运行人工及维护成本等成本模块,每个模块分别表示为与线路截面、时间等因素相关联的表达式,从而推导出输电线路总成本费用的经济电流密度表达式。通过总成本费用模型对一条已建成的线路进行了验证,证明了方法的合理性和可行性。改进的计算方法对实际工程选型方案的确定有一定的参考价值。 The traditional calculation method doesn′t takes into account the time value of important parameters such as line maintenance costs,line decommissioning costs,electricity prices,conductor prices,etc.,resulting in a big calculated current density,so an economic current density calculation method based on total cost comprehensive evaluation model is proposed.The total cost of the line is divided into cost modules such as initial input costs,operating labor and maintenance costs.Each module is expressed as an expression related to factors such as line cross-section,time,etc.,thereby deriving an economic current density expression of the total cost of the transmission line.The total cost model is used to verify an established line,and the rationality and feasibility of the method are proved.It provides reference for the practical engineering type-selecting scheme.
作者 樊浩 王永生 陈金辉 FAN Hao;WANG Yongsheng;CHEN Jinhui(Skills Training Center,Northern Hebei Province and Power Company Limited,Baoding,Hebei 071051,China)
出处 《河北工业科技》 CAS 2020年第1期27-33,共7页 Hebei Journal of Industrial Science and Technology
关键词 输配电工程 经济电流密度 总成本费用 截面 评价模型 transmission and distribution engineering the economic current density total cost section evaluation model
  • 相关文献

参考文献10

二级参考文献53

共引文献291

同被引文献9

引证文献2

二级引证文献2

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部