万家口子水电站位于云贵高原喀斯特地区,大坝挡水建筑物为碾压混凝土双曲拱坝,坝基地质复杂,大坝设计极具挑战,采用多种先进技术设计、先进工艺技术施工,成功建成目前世界上最高碾压混凝土双曲拱坝,初期蓄水运行监测表明,拱坝运行性态正常。
Wanjiakouzi Hydropower Station is located in the karst area of Yunnan-Guizhou Plateau.The dam water retaining structure is RCC double curvature arch dam.The dam foundation geology is complex,and the dam design is extremely challenging.It adopts a variety of advanced technology design and advanced technology construction.The world’ s highest RCC double curvature arch dam has been successfully built.The initial water storage operation monitoring shows that the operation of the arch dam is normal.
作者
高宇
盘春军
卢山
GAO Yu;PAN Chunjun;LU Shan(Datang Xuanwei Hydro Power Development Co.Ltd.,Xuanwei Yunnan 655400;China Energy Engineering Group Guangxi Electric Power Design Institute Co.Ltd.,Nanning Guangxi 530007;China Energy Engineering Group Guangxi Hydroelectric Construction Bureau Co.Ltd.,Nanning Guangxi 530001)
出处
《红水河》
2020年第1期1-6,共6页
Hongshui River
关键词
碾压混凝土双曲拱坝
枢纽布置
设计
施工
特点
万家口子水电站
RCC double curvature arch dam
layout of hydroproject
design
construction
feature
Wanjiakouzi Hydropower Station