摘要
岩土工程在进行边坡治理的过程中,采用预应力锚索技术是针对大量的永久性岩体进行边坡固定的有效手段。近年来,在岩土工程的边坡治理过程中预应力锚索技术的应用越来越广泛,针对岩土工程治理过程中的预应力锚索技术进行详细的分析,首先概述了预应力锚索技术,然后针对预应力锚索技术在岩土工程边坡治理工程中的作用机理进行了详细的分析。探讨了预应力锚索技术在岩土工程边坡治理过程中的优势,结合具体的应用技巧进行了论述,以期为相关专业提供理论指导和经验借鉴。
In the process of slope treatment in geotechnical engineering,the use of pre-stressed anchor cable technology is an effective means of slope stabilization for a large number of permanent rock masses.In recent years,the application of prestressing anchor cable technology in slope treatment of geotechnical engineering is more and more extensive.In this paper,the prestressing anchor cable technology in the process of geotechnical engineering treatment is analyzed in detail.Firstly,the prestressing anchor cable technology is summarized,and then the prestressing anchor cable technology is applied in slope treatment of geotechnical engineering.The mechanism of action is analyzed in detail.This paper discusses the advantages of prestressing anchor cable technology in the process of slope treatment in geotechnical engineering,and expounds its application skills in order to provide theoretical guidance and experience for relevant specialties.
出处
《建筑技术开发》
2019年第23期160-161,共2页
Building Technology Development
关键词
预应力锚索技术
岩土工程
边坡治理
应用策略
prestressed anchor cable technology
geotechnical engineering
slope treatment
application strategy