摘要
从管理环境和技术手段两个方面解决全流程成本确定问题。提出能够有效集成生产各阶段关键成本因素的生产组织模式,在此基础上,以构件拆分方案为初始条件,建立全流程成本确定模型,从而能够基于具体拆分方案准确而快速地确定装配式建筑生产的全流程成本,为下一步进行拆分方案与全流程成本协同优化打下良好的基础。
This paper deals with the whole process cost determination from two aspects of management environment and technical means.Firstly,a production organization model which can effectively integrate the key cost factors in each stage of production is proposed.On this basis,the component splitting scheme is taken as the initial condition to establish the whole process cost determination model.Therefore,the whole process cost of assembly construction production can be determined accurately and quickly based on the specific split scheme,which lays a good foundation for the next step of the split scheme and the collaborative optimization of the whole process cost.
作者
宫培松
张济武
熊峰
张云
GONG Peisong;ZHANG Jiwu;XIONG Feng;ZHANG Yun(China University of Geosciences,Wuhan 430074,China;Huazhong University of Science and Technology,Wuhan 430074,China;Zhongnan University of Economics and Law,Wuhan 430073,China;Wuhan Metro Group,Wuhan 430070,China)
出处
《建筑经济》
北大核心
2020年第1期76-83,共8页
Construction Economy
关键词
装配式建筑
组织模式
建筑供应链
成本管理
prefabricated building
organizational mode
building supply chain
cost management