摘要
由于矿山开采工作的变化,工程量也相对增大,嵩县山金矿现有主竖井提升能力已经远远不能满足生产需要,这严重的影响着矿山企业的工作效率,亟待能找到一套能有效挖潜提效的措施来解决这一问题,本文将就此展开研究,通过多方面对嵩县山金主竖井进行优化,以有效实现挖潜提效,成功破解生产发展提升瓶颈制约,提高生产效率。
Due to the change of mining work and the increase of engineering quantity,the lifting capacity of the existing main shaft in Songxian mountain gold mine is far from meeting the production needs,which seriously affects the working efficiency of mining enterprises,and it is urgent to find a set of measures to effectively tap the potential and improve the efficiency to solve this problem.This paper will carry out research on this,through many aspects of the main shaft in Songxian mountain gold mine Optimize to effectively tap potential and improve efficiency,successfully break the bottleneck constraints of production development and enhance production efficiency.
作者
任祖嵘
王玉琦
张涛
REN Zu-rong;WANG Yu-qi;ZHANG Tao(Songxian Shanjin Mining Co.,Ltd,Luoyang 471400,China)
出处
《世界有色金属》
2019年第22期237-238,共2页
World Nonferrous Metals
关键词
金矿
竖井提升系统
挖潜提效
措施
方法
gold mine
shaft lifting system
tapping potential and improving efficiency
measures
methods