摘要 本文以赞比亚卡夫拉夫塔供水工程为例,阐述了长距离输水管线中二次增压泵站选址的要点,着重研究了地形对水泵扬程和系统方案的影响。结合非洲实际情况,对系统进行水锤模拟,综合比选了防水锤型复合排气阀,水锤预作用阀与内胆式水锤消除罐的水锤防护效果。随着“一带一路”项目的日益增多,本文对于非洲地区类似原水输水工程具有借鉴意义。 This paper took Zambia Kafulafuta Water Supply Project in Africa as an example,expounded the key points of the site selection of the secondary booster pump station in the long-distance water transmission project,and studied the influence of topography on the pump head and system scheme.This paper considered the actual situation in Africa,and conducted the water hammer simulation.Water hammer compound exhaust valve,water hammer preaction valve,water hammer elimination tank were compared.With the increasing number of"The Belt and Road"projects,this paper is of reference significance for similar raw water transmission projects in Africa.
作者 何文宇 HE Wen-yu(Shanghai Construction Group,Shanghai 200080,China)
出处 《价值工程》 2020年第3期291-295,共5页 Value Engineering
关键词 长距离输水 泵站选址 水锤模拟 一带一路 long-distance water transmission site selection of pump station water hammer simulation The Belt and Road
  • 相关文献

参考文献3

二级参考文献3

共引文献3

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部