摘要
随着BIM(建筑信息模型)技术在国内建筑行业的逐渐推广使用,与BIM相结合的各类新型施工工装工艺逐渐替代传统的施工工艺,在保证施工质量的前提下,强化施工超前的控制,弱化施工的过程控制,减少施工通病的出现。BIM优化下的连续梁施工技术是在BIM优化的基础上,结合现场施工,辅之以新型的工装工艺,保障现场施工的效率和质量。本文就连续梁施工的工艺工装在濉溪大桥的应用进行论述,解决目前施工中存在的一些连续梁施工通病。
With the gradual promotion and use of BIM technology in the domestic construction industry,various new construction tooling processes combined with BIM gradually replace traditional construction techniques.Under the premise of ensuring the quality of construction,it is necessary to strengthen the advance control of construction,weaken the construction process control and reduce the occurrence of common construction problems.The continuous beam construction technology under BIM optimization is based on BIM optimization,combined with on-site construction,and supplemented with new tooling technology to ensure the efficiency and quality of on-site construction.This article discusses the application of continuous beam construction technology to the Suixi Bridge,and solves some common problems in continuous beam construction in current construction.
作者
吴瑞
WU Rui(China Railway 11th Bureau Group Second Engineering Co.,Ltd.,Shiyan 442000,China)
出处
《价值工程》
2020年第3期193-195,共3页
Value Engineering
关键词
BIM技术
连续梁
工艺工装应用
质量通病
BIM technology
continuous beam
process tooling application
common quality problems