摘要
电厂锅炉脱硫脱硝系统在实际运行的过程中,出现问题的概率较高。因此,在对电厂锅炉烟气进行脱硫处理的过程中,往往需要经过多重技术手段,才能达到预定目标。而在对烟气进行脱硝处理的过程中,经常会因为氨水浓度过高而出现一系列的问题,因此,加强对脱硫脱硝系统的优化,及时对设备进行改造十分有必要。本文就针对电厂锅炉脱离硫脱硝系统运行过程中存在的问题以及具体的处理措施进行了相应的研究。
The probability of problems in the actual operation of the power plant boiler desulfurization and denitration system is high.Therefore,in the process of desulfurization of power plant boiler flue gas,it is often necessary to go through multiple technical means to achieve the intended goal.In the process of denitration treatment of flue gas,a series of problems often occur due to the high concentration of ammonia water.Therefore,it is necessary to strengthen the optimization of the desulfurization and denitration system and timely modify the equipment.I have carried out corresponding research on the problems existing in the operation process of the power plant boiler desulfurization and denitration system and the specific treatment measures.
出处
《电力系统装备》
2019年第24期120-121,共2页
Electric Power System Equipment
关键词
锅炉
脱硫脱硝
存在问题
处理措施
boiler
desulfurization and denitrification
existing problems
treatment measures