摘要
印度JHPL项目在CH50处采用奥格顶管连续穿越国道和铁路,地下2m以下为砂层,地下水丰富,易涌水涌砂,施工难度较大。通过对施工的前期、施工过程进行风险识别和控制,保证了工程的顺利完工。
The JHPL project in India uses the Auger pipe to continuously cross national roads and railways at CH50.The sand layer is less than 2 meters below the ground,which is rich in groundwater and prone to gushing water and sand,making construction difficult.Through the identification and control of risks in the pre-construction and construction process,the smooth completion of the project is guaranteed.