期刊文献+

地铁小井口竖井后方交会和双联系三角形测量精度分析 被引量:4

Measurement Precision Analysis of Resection and Double Contact Triangle in the Small Wellhead Shaft of Subway
下载PDF
导出
摘要 在城市轨道交通建设过程中,小井口竖井越来越多,如何通过小竖井将地面坐标准确传递至隧道内是施工测量面临的重要问题,目前应用较多的是联系三角形法。本文通过在北京地铁8号线二期工程小井口竖井联系测量中的应用得出,采用后方交会法进行平面联系测量是完全可行的,施测过程相对简单,测量精度也满足规范要求,对小井口竖井的平面联系测量具有一定的指导意义。 In the process of subway construction,how to ensure the measurement precision through a small wellhead shaft to tunnel is an important problem. This paper analyzed the measurement precision of resection and double contact triangle in the small wellhead shaft of subway,the method of resection is adopted to plane contact measurement,and gave a case in Beijing subway line 8,the result shows that the method is feasible,measuring process is relatively simple,measurement precision meets the specification requirement. It has a certain guiding significance to the plane contact measurement of wellhead shaft.
作者 刘瑞敏 高帅 马全明 Liu Ruimin;Gao Shuai;Ma Quanming(Beijing Urban Construction Exploration&Surveying Design Research Institute Co.,Ltd.,Beijing 100101,China)
出处 《城市勘测》 2019年第6期163-166,共4页 Urban Geotechnical Investigation & Surveying
关键词 小井口竖井 平面联系测量 联系三角形 后方交会 精度 small wellhead shaft plane contact measurement contact triangle resection precision
  • 相关文献

参考文献8

二级参考文献25

共引文献41

同被引文献30

引证文献4

二级引证文献4

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部