黎川县龙安河中田、樟溪段防洪整治工程探讨

Discussion on flood control and regulation project of Longan River Zhongtian and Zhangxi Section in Lichuan County
下载PDF
导出
摘要 针对龙安河中田、樟溪段河道特征,通过方案比选狭窄河段采用干砌块石+网格草皮堤防,开阔河段直接采用草皮护坡;在缓岸坡非顶河段采用干砌块石+网格草皮护岸,针对冲刷、塌方严重河段采用M7.5浆砌石重力式趾墙+网格草皮护岸;在陡岸坡且冲刷严重河段采用M7.5浆砌块石仰斜式趾墙护岸;平顺段采用草皮护坡。 According to the characteristics of Longan River(Zhongtian,Zhangxi)reach,dry block stone+grid turf dike is adopted in narrow reach and turf slope protection is adopted directly in open reach,while dry block stone+grid turf revetment is adopted in gentle bank non-top reach,and gravity type of M7.5 mortar stone is adopted in serious scour and collapse reach.Toe wall+grid turf revetment;M7.5 masonry stone uphill toe wall revetment in steep bank slope and serious erosion section;and turf revetment in smooth section.
作者 王芳佳 王建明 WANG fang-jia;WANG Jian-ming(Jiangxi Anyu Engineering Consulting Co.Ltd.,Nanchang 330000,China;Dongguan Water Resources Survey and Design Institute Co.,Ltd.,Dongwan 523115,China)
出处 《水科学与工程技术》 2019年第6期92-94,共3页 Water Sciences and Engineering Technology
关键词 防洪 堤防 护岸 flood control dike revetment
  • 相关文献

参考文献9

二级参考文献41

共引文献36

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部