金龙20井S2层加砂压裂后出砂原因分析

Analysis of Sand Production Reasons after Sand Fracturing in S2 Layer of Jinlong 20 Well
下载PDF
导出
摘要 本文通过分析压裂液性及施工过程;退液、试产时期的出砂规律等。认为由于压裂砂掩埋了射孔段及以下口袋,随着地层流体的排出,沉积在井底的压裂砂被携带出来,最后提出了应对类似出砂井的措施。 This paper analyses the fracturing fluid property and construction process,the sand production law during fluid withdrawal and trial production,etc.It is considered that the fractured sand buries the perforation section and the pockets below,along with the discharge of formation fluid.The fractured sand deposited at the bottom of the well is carried out. Finally,measures to deal with similar sand production wells are put forward.
作者 郝晓波 刘毅 张文全 方云贵 Hao Xiaobo;Liu Yi;Zhang Wenquan;Fang Yungui(PetroChina Western Drilling and Testing Company,Xinjiang Karamay 834000)
出处 《石化技术》 CAS 2019年第10期69-70,共2页 Petrochemical Industry Technology
关键词 加砂压裂 砂堵 压裂砂回流 Sand fracturing Sand plug Fractured sand reflux
  • 相关文献

参考文献2

二级参考文献7

  • 1宋军正,郭建春.压裂气井出砂机理研究[J].钻采工艺,2005,28(2):20-21. 被引量:20
  • 2[1]Almond S W,Penny G S,Conway M W.Factors Affecting Proppant Flowback With Resin Coated Proppants[C].SPE 30096,1995. 被引量:1
  • 3[2]Andrews J S,Kjorholt H.Rock Mechanical Principles To Predict Proppant Flowback From Hydraulic Fractures[C].SPE/ISRM 47382,1998. 被引量:1
  • 4Almond S W, Penny G S, Conway M W. Factors Affecting Proppant Flowback With Resin Coated Proppants[J].SPE 30096,1995. 被引量:1
  • 5[美]GidleyJL.水力压裂技术新进展[M].北京:石油工业出版社,1995.. 被引量:1
  • 6Andrews J S,H KjOrholt. Rock Mechanical Principles To Predict Proppant Flowback From Hydraulic Fractures [J]. SPE/ISRM 47382,1998. 被引量:1
  • 7何世云,陈琛.加砂压裂压后排液的控砂技术[J].天然气工业,2002,22(3):45-46. 被引量:39

共引文献38

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部