期刊文献+

输电线路作业拆装接地线方法探讨 被引量:3

Discussion on Method of Removing and Installing Grounding Wire in Transmission Line Operation
下载PDF
导出
摘要 在电网输电线路施工、改造、常规定检、调试时,需要在线路检修前后对接地线进行装拆,才能有效保证作业人员和电力设施的安全。目前,针对拆装接地线的方法有很多,但大多程序繁琐、效率低下且容易出错。而且输电线路中同杆多回、高空作业空间有限和验电困难等不利因素较多,在作业过程中容易误拆、装接地线,从而引起触电、带接地线合闸等恶性事故。文章针对输电线路工作挂接地线误操作的安全问题,提出了一些有效的解决方法及防范措施,能够降低上述风险、保障施工人员及电网安全、提高工作效率。 In the construction,transformation,routine inspection and debugging of power transmission lines,it is necessary to assemble and disassemble the grounding wires before and after line maintenance in order to effectively guarantee the safety of operators and power facilities.At present,there are many ways to disassemble and assemble grounding wires,but most of them are cumbersome,inefficient and error-prone.At the same time,there are many unfavorable factors in the transmission line,such as multiple trips on the same pole,limited working space at high altitude and difficulty in checking electricity.It is easy to dismantle and install grounding wires in the process of operation,resulting in vicious accidents such as electric shock and closing with grounding wires.In this paper,aiming at the safety problem of misoperation of transmission line working hanging grounding wire,some effective solutions and preventive measures were put forward,which couldreduce the above risks,ensure the safety of construction personnel and power grid,and improve work efficiency.
作者 张晓龙 王继承 周东伟 宫贺 李国武 蒋正虎 ZHANG Xiaolong;WANG Jicheng;ZHOU Dongwei;GONG He;LI Guowu;JIANG Zhenghu(Baoshan Power Supply Bureau,Yunnan Power Grid Company Limited Liability,Baoshan 678000,China)
出处 《电工技术》 2019年第22期63-64,66,共3页 Electric Engineering
关键词 输电线路 拆装接地线 误操作 防范措施 transmission line removingand installing grounding wire misoperation preventive measures
  • 相关文献

参考文献3

二级参考文献3

共引文献2

同被引文献17

引证文献3

二级引证文献1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部