期刊文献+

基于风电预测误差聚类的分布鲁棒含储能机组组合 被引量:25

Distributed Robust Unit Commitment with Energy Storage Based on Forecasting Error Clustering of Wind Power
下载PDF
导出
摘要 为应对风电不确定性给电力系统调度带来的难题,提出了一种基于风电预测误差聚类的分布鲁棒含储能机组组合模型。首先,基于狄利克雷过程高斯混合模型对风电预测误差进行聚类,建立了数据驱动的风电预测误差模糊集,并进一步建立了考虑风电场间风电预测误差相关性的不确定集。接着提出了考虑储能的分布鲁棒机组组合模型,建立了考虑储能系统循环老化成本的目标函数。针对该模型min-max-max-min的4层结构,将其分解为两阶段问题,在第1阶段中引入运行域变量、爬坡事件约束与储能能量约束,以消去第2阶段中的动态约束,并将第2阶段问题通过KKT条件转化为单层问题,然后采用列约束生成算法对两阶段问题进行求解。最后,通过IEEE 6节点以及IEEE 118节点的算例分析,证明了所提模型的鲁棒性和有效性。 In order to solve the problem of power system dispatching caused by wind power uncertainty,this paper proposes a distributed robust model for unit commitment with energy storage based on forecasting error clustering of wind power.Firstly,based on the Dirichlet process Gaussian mixture model(DPGMM),the wind power forecasting error is clustered to establish a data-driven fuzzy set of wind power forecasting error.The uncertainty set considering the correlation of wind power forecasting errors between wind farms is further established.Then,a distributed robust unit commitment model considering energy storage is proposed,and an objective function considering the cyclic aging of the energy storage system is established.Then the model with the min-max-max-min structure is decomposed into a two-stage problem.In the first stage,the operation region variable,the climbing event constraint and the energy constraint of energy storage are introduced to eliminate the dynamic constraints at the second stage.The second stage problem is transformed into a single-layer problem by KKT condition,and the two-stage problem is solved by the column and constraint generation(C&CG)algorithm.Finally,the robustness and effectiveness of the proposed model are proved by the example analysis based on IEEE6-bus and IEEE 118-bus systems.
作者 施云辉 王橹裕 陈玮 郭创新 SHI Yunhui;WANG Luyu;CHEN Wei;GUO Chuangxin(College of Electrical Engineering,Zhejiang University,Hangzhou 310027,China)
出处 《电力系统自动化》 EI CSCD 北大核心 2019年第22期3-12,121,共11页 Automation of Electric Power Systems
基金 国家重点研发计划资助项目(2017YFB0902600) 国家电网公司科技项目(SGJS0000DKJS1700840)~~
关键词 狄利克雷过程高斯混合模型 分布鲁棒优化 非参数贝叶斯 锂电池储能 风电不确定性 运行域 Dirichlet process Gaussian mixture model(DPGMM) distributed robust optimization non-parametric Bayesian lithium-ion battery energy storage wind power uncertainty operation region
  • 相关文献

参考文献7

二级参考文献61

共引文献170

同被引文献405

引证文献25

二级引证文献366

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部