摘要
结合在建的跨海大桥--鱼山大桥工程的实际情况,围绕节段梁段高精度控制方法和体外预应力高精度定位方法展开研究,以期为同类工程施工积累经验。
Based on the actual situation of the cross-sea bridge--Yushan bridge project under construction,this paper studies the high-precision control method of section beam section and high-precision positioning method of external prestressing,so as to accumulate experience for similar projects.
作者
王海峰
周锋
周联英
WANG Hai-feng;ZHOU Feng;ZHOU Lian-ying(Zhejiang Communication Construction Group Co.Ltd.,Hangzhou 310051,China;Zhejiang University City College,Hangzhou 310015,China)
出处
《工程建设与设计》
2019年第21期219-220,223,共3页
Construction & Design for Engineering
关键词
连续刚构桥
预制装配
精度控制
continuous rigid frame bridge
prefabricated assembly
precision control