摘要
针对条带煤柱炮采工艺效率低、人员多的实际情况,组织开展了机械化充填开采技术研究,形成了平行条带布置工作面机采充填技术,对地表移动变形进行了采前预估,地表在Ⅰ级损坏范围内,可以实现安全高效开采。
Aiming at the actual situation of low efficiency and large number of personnel in strip pillar blasting mining technology,the mechanized backfilling mining technology was organized and developed,and the parallel strip layout face mechanized backfilling technology was formed.The surface movement and deformation were predicted before mining.The surface could be safely and efficiently exploited within the damage range of grade I.
作者
林淑文
曾广东
郭少华
Lin Shu-wen;Zeng Guang-dong;Guo Shao-hua(Tengzhou Jixiang(Group)Jisuo Coal Mine,Shandong Tengzhou 277500)
出处
《山东煤炭科技》
2019年第8期80-81,共2页
Shandong Coal Science and Technology
关键词
薄煤层
充填
采煤
thin coal seam
filling
coal mining