期刊文献+

FPSO火炬塔海运绑扎方案及强度校核 被引量:2

Maritime Lashing Scheme and Strength Check of FPSO Torch Tower Shipping
下载PDF
导出
摘要 大连中远海运重工有限公司(以下简称“公司”)承接的FPSO(Floating Production Storage and Offloading,浮式生产储油卸油装置)改装项目“MV29”轮的火炬塔结构在公司预制。完成后,将火炬塔水平放置在“MV29”的pancake结构上并进行海运绑扎,船舶离厂时火炬塔随船运输。为保证火炬塔运输在船舶长时间航行过程中的安全性,现设计一种支撑工装,用于放置火炬塔并对其进行封固,以保证火炬塔的结构、附件等在运输过程中不被破坏。 The flare tower structure on MV29 of FPSO conversion project which carried on by COSCO(DALIAN)SHIPPING HEAVY INDUSTRY CO.,LTD.,will pre-fabricate in the company.After finishing pre-fabrication,the flare tower will lay on the pancake structure of MV29 horizontally fastening by sea and transit with the carrier when the carrier leaves.In order to ensure the safety of the torch tower transportation during the long-term towing of the ship,a supporting tooling is designed.The tool is designed for placing and sealing to ensure that the flare tower structure and accessories are not damaged during towage transportation.
作者 张平 李勇 ZHANG Ping;LI Yong(COSCO(Dalian)Shipping Heavy Industry Co.,Ltd.,Liaoning Dalian 116113,China)
出处 《船舶标准化工程师》 2019年第4期41-45,共5页 Ship Standardization Engineer
关键词 火炬塔 海运绑扎 运输工装 flare tower,maritime lashing transit tooling
  • 相关文献

参考文献3

二级参考文献14

共引文献19

同被引文献8

引证文献2

二级引证文献6

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部