摘要
我国水土保持科技示范园区创建仍处于探索阶段,尚未建立完善的规划理论和规范,很大程度上限制了各地园区的建设和发展,为提高水土保持科技示范园区规划技术水平和建设质量,亟需开展园区建设规划技术体系的研究。本文通过系统梳理相关文献、国家法律法规及部门相关文件,结合四川省典型园区规划实践,探讨了园区规划设计中的有关技术要点。针对园区规划实际工作中未形成统一和系统的技术路线的现状,本文阐述了园区建设规划的设计思路,明确了规划应涵盖的主要内容和工作要求,并以简阳市南冲堰示范园区规划为例,介绍了基础条件分析、规划范围与功能分区划定、建设内容与进度部署安排等方面的规划成果。水土保持科技示范园区建设规划是项目建设前期工作的重要依据,规划编制应满足水土保持建设项目前期工作可行性研究阶段的基本要求,可按照园址踏勘遴选、数据资料获取、目标定位确立、边界分区划定、内容布局设计、投资进度安排、保障措施制定、文本图件编绘的工作步骤和技术思路开展工作。
[Background] The establishment of science & technology demonstration park for soil and water conservation( DPSWC) in China is currently still in the exploratory stage,and has not yet formed perfect planning theory and norms. In order to provide theoretical and practical basis for the planning of DPSWC,the key points and methods that should be noted in the planning of the DPSWC were discussed here. [Methods]Combining the planning practice of typical DPSWC in Sichuan province and according to the literature,national laws and regulations,and relevant documents of departments,the ideas and relevant technical points for the planning of the science and technology demonstration park were analyzed.[Results]The main content of collecting data,confirming boundary zoning,designing layout,planning investment schedule in DPSWC planning were put forward,and the working requirements of maps drafting and documents outline during the planning were also defined. Based on the above mentioned design ideas,the planning results of basic condition analysis,construction objectives,planning scope and functional zoning, construction content and schedule arrangement for Nanchongyan DPSWC were introduced. The planning achievements fully considered the characteristics of the park and determined the reasonable construction objectives. Meanwhile,the planning results also efficient integrated soil and water conservation with ecological orchards,industrial development and tourism. Furthermore,the planning achievement perfected soil and water conservation measures in Nanchongyan DPSWC and improved the effects of demonstration and science popularization. [Conclusions]Overall,the construction planning is an important basis for the pre-construction work of the DPSWC. The planning compilation should meet the basic requirements during the feasibility study stage at the pre-construction work of soil and water conservation project. It should be followed the steps of selecting site,collecting data,determining target,confirming boundary zoning, designing
作者
鲍玉海
殷燕利
秦伟
陈尚书
贺秀斌
BAO Yuhai;YIN Yanli;QIN Wei;CHEN Shangshu;HE Xiubin(Institute of Mountain Hazards & Environment,Chinese Academy of Sciences,610041,Chengdu,China;Jianyang Water Bureau of Sichuan Province,641400.Jianyang,Sichuan.China;China Institute of Water Resources and Hydropower Research,100048,Beijing,China;Bureau of Soil and Vi aler Conservancy of Sichuan Province,610065,Chengdu,China)
出处
《中国水土保持科学》
CSCD
北大核心
2019年第3期148-154,共7页
Science of Soil and Water Conservation
基金
简阳市水务局“简阳南冲堰水土保持科技示范园区建设规划”
四川省水土保持局“四川省水土保持科技示范园区建设与管理总体规划”
关键词
水土保持科技示范园
规划
生态产业型
功能分区
science&technology demonstration park for soil and water conservation
planning
ecological industrial park
function division