期刊文献+

安塞油田长6油层端部脱砂压裂试验

FRACTURING TEST OF END SAND-OUT IN CHANG-6 RESERVOIR OF ANSAI OILFIELD
下载PDF
导出
摘要 长 6油层是安塞油田的主力油层 ,天然微细裂缝比较发育 ,注水开发以来 ,受微裂缝影响 ,部分区块主向油井见效后含水上升快甚至水淹 ,而侧向油井难以见效 ,造成区块内产量和压力分布严重不均 ,影响了开发效果。蜡球暂堵端部脱砂压裂技术可以最大程度地增加油层泄油面积 ,提高填砂裂缝导流能力 ,在现场试验取得了明显的效果 ,为长 6油藏侧向油井的重复压裂改造摸索出一条新的出路。 Chang-6 reservoir is main pay in Ansai oilfield.There are developing natural microfracture.Water cut of oil wells of major direction in some tract rapidly raise indeed watered out since waterflooding and effecting of microfracture,but oil wells of side direction were no-response.It make output and pressure nonuniform in tract and effect development result.How to enhance output of side direction oil well is one of main problems on stable oil production.Wax Bead Temporary Blocking End Sand-Out Fracturing Technique has gained obvious effect in field test.It can increase drainage area of reservoir and improve flow conductivity of sand packed fracture.A new method was fished out through refracturing of side direction oil wells in Chang-6 reservoir.
出处 《钻采工艺》 CAS 2002年第6期39-41,45,共4页 Drilling & Production Technology
关键词 安塞油田 长6油层 端部 脱砂压裂 试验 暂堵 Ansai oilfield,oil reservoir,fracturing,temporary blocking,sand-out
  • 相关文献

参考文献1

  • 1-.采油技术手册压裂酸化全反射手册[M].石油工业出版社,-.. 被引量:1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部