2W.S. Humphrey and W.L Sweet. A method for assessing the software engineering capability of contractors. SEI Technical Report SEI-87-TR-23, September 1989. 被引量:1
3Hinks, J., Aouad, G., Cooper, R., Sheath, D., Kagioglou,M., and Sexton, M. "IT and the design and construction process:A conceptual model of co-maturation." Int. J. Constr. Information Technol., 1997, 5(1),PP1-25. 被引量:1
4YoungHoonKwak C. William Ibbs.Financial and Organizational Impacts of Project Management[A]..PMI 第28届学术研讨会[C].,1997,9.. 被引量:1
5Young Hoon Kwak ,C. William Ibbs, Project Management Process Maturity (PM)2 Model. Journal of Management in Engineering July 2002, pp150-155. 被引量:1
6Knapp & Moore Pty Limited. Maturity Assessment. Available from: http://www.knappandmoore.com.au. 被引量:1
7Knapp & Moore Pty Limited.Individual Competencies.Available from: http://www.knappandmoore.com.au. 被引量:1