以山西忻州某矿9301工作面为工程背景,对9301工作面运输巷试验切顶卸压成巷无煤柱开采技术,通过顶板爆破预裂技术+恒阻大变形锚索+留巷段巷道支护及挡矸设计,减小了巷道围岩变形,实现了无煤柱开采。现场监测表明,该技术达到了预期效果。切顶卸压成巷无煤柱开采技术在该矿的成功试验,不仅解决了采掘接替紧张的问题,而且有效提高了煤炭资源的回收率。
Based on the engineering background of 9301 working face of a mine in Xinzhou, Shanxi Province, the test of roof-cutting and pressure-relief of transport roadway in 9301 working face was carried out to mine without coal pillars. By using roof blasting pre-splitting technology, constant resistance large deformation anchor cable and retaining roadway supporting and gangue design, the deformation of roadway surrounding rock was reduced and no-pillar mining was realized. Field monitoring showed that the expected effect has been achieved by using this technology. The success of roof-cutting and pressure-relief roadway without coal pillar mining technology in this mine not only solves the problem of shortage of mining replacement, but also effectively improves the recovery rate of coal resources.
作者
王正洋
WANG Zheng-yang(Nancha Coal Industry Co., Ltd., Shanxi Xinzhou Shenda Energy Group, Xinzhou,Shanxi, 036700)
出处
《煤炭科技》
2019年第5期35-38,共4页
Coal Science & Technology Magazine
关键词
切顶卸压
无煤柱开采
预裂爆破
恒阻支护
roof-cutting and pressure-relief
no-pillar mining technology
pre-splitting blasting
constant resistance supporting