多搅拌系统高压浸出釜的制造

Manufacture of High Pressure Leaching Tank with Multi-stirring System
下载PDF
导出
摘要 重点介绍了多搅拌系统高压浸出釜的制造过程,对设备成型、焊接、酸洗、热处理、耐压试验、氦泄漏试验等制造检验方法进行了总结,并对制造过程中关键点的质量问题及解决措施加以阐述. The manufacturing process of high-pressure leaching tank with multi-stirring system was introduced. The manufacturing inspection methods such as equipment forming, welding, pickling, heat treatment, pressure test and helium leak test were summarized. The quality problems of key points in the manufacturing process and the solving measures were expounded.
作者 张永健 ZHANG Yongjian
出处 《化工装备技术》 CAS 2019年第5期62-65,共4页 Chemical Equipment Technology
关键词 压力容器 浸出釜 设备制造 质量控制 Pressure vessel Leaching tank Equipment manufacturing Quality control