白鹤滩水电站建设中的几个重点难题 被引量:2

Several key difficulties in Baihetan Project construction
下载PDF
导出
摘要 白鹤滩水电站工程规模巨大,地质条件复杂,技术难度大。针对工程重点难点,三峡集团联合国内外科研机构和高等院校开展专题科学研究和技术攻关,成功解决了复杂地形地质条件下不对称拱坝设计和抗滑稳定、强震区超高拱坝与超高边坡抗震、全坝使用低热水泥、百万千瓦级水轮发电机组研究和应用、窄河谷高水头大泄量枢纽泄洪消能技术、高应力复杂地质条件下巨型地下洞室群开挖支护设计、复杂水文地质条件下枢纽工程防渗体系设计等世界级关键技术问题,取得了丰硕的研究成果。 Baihetan Hydropower Station is a super large project that combines with complicated geological conditions and technical difficulties.Thanks to the joint efforts of China Three Gorges Corporation and other research institutions and universities at home and abroad,world-class key technologies have been tackled and achieved fruitful study results in the subjects of asymmetric arch dam design,anti-sliding stability of hydraulic structures,seismic resistance of super-high arch dam and super-high slope in strong seismic zone,low-temperature cement used in the whole dam,manufacturing and installation of million kilowatt hydro-generator units,flood discharge and energy dissipation technology for high head and large discharge junction in narrow valley,excavation support design of giant underground chambers under high stress conditions and design of seepage control system for complex under complicated hydrogeological conditions.
作者 陈浩 王玮 欧阳秋平 Chen Hao;Wang Wei;Ouyang Qiuping
出处 《中国水利》 2019年第18期33-35,共3页 China Water Resources
关键词 白鹤滩水电站 规模 地质条件 技术难度 研究 Baihetan Hydropower Station scale geological condition technical difficulties research and studies
  • 相关文献

同被引文献40

引证文献2

二级引证文献7

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部