摘要
针对冀中能源峰峰集团九龙矿15449S工作面目前面临顶板来压强度大、推进速度慢等制约矿井安全高效的生产状况,运用理论分析和现场实测相结合的方法,分析了切顶预裂卸压技术的基本原理。根据现场实际情况,提出了采用切顶预裂卸压爆破技术,超前预处理顶板,减小顶板来压时强度。
In view of the high pressure and slow speed of the 15449S working face of Jiulong Mine of Jizhong Energy Fengfeng Group restricting the safe and efficient mining, and the combination of theoretical analysis and field measurement was used. The basic principle of pre-cracking and pressure relief technology combined with the actual situation of the site,the use of cutting-edge pre-cracking pressure relief blasting technology was proposed to pre-treat the top plate to reduce the strength of the roof.
作者
李晓华
Li Xiaohua(Jizhong Energy Fengfeng Group, Handan 056107, China)
出处
《煤炭与化工》
CAS
2019年第9期1-5,共5页
Coal and Chemical Industry
关键词
深部开采
坚硬顶板
切顶卸压
预裂爆破
deep mining
hard roof
top-loading pressure relief
pre-cracking