期刊文献+

环境影响评价工作中存在的问题及措施 被引量:3

Problems and measures in the work of environmental impact assessment
下载PDF
导出
摘要 环评工作为环境保护起重要的指导作用,是衡量工程对环境影响的重要手段之一,而在环评工作中,通常存在着收费问题、环评内容问题、公众参与问题等,此类问题直接影响着环保措施的可行性,只有解决此类问题,才能保证环境工程质量。 The eia work plays an important role in guiding for the environmental protection, is one of the important means of the environmental impact to measure project, and in the eia work, usually there is a charge problem, eia content problems, public participation and so on, these problems directly affect the feasibility of the environmental protection measures, only to solve such problems, can guarantee the quality of environmental engineering.
作者 陈炜 Chen Wei(Xinjiang Uygur Autonomous Region Environmental Engineering Assessment Center,Urumqi Xinjiang 830003,China)
出处 《环境与发展》 2019年第9期22-22,24,共2页 Environment & Development
关键词 环境影响评价 问题 措施 Environmental impact assessment Problem Measures
  • 相关文献

参考文献3

二级参考文献9

共引文献5

同被引文献10

引证文献3

二级引证文献1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部