摘要
文章以实际工程为例,分析了大跨径隧道双侧壁导坑法施工过程及工艺,并探讨了施工过程技术控制要点,以保证隧道施工安全,达到设计及相关技术规范要求。
Taking the actual engineering as the example,this article analyzes the construction process and technology of double sidewall guiding pit method for large-span tunnels,and discusses the technical control points of construction process to ensure the safety of tunnel construction and meet the requirements of design and related technical specifications.