35kV及以下配电设备的安装及交接试验 被引量:1

The Installation and Handover Test of Distribution Equipment of 35kV and Below
下载PDF
导出
摘要 为了保证电气系统能够正常稳定地运行,在配电设备完安装之后必须要进行交接实验,只有接试验结果良好才能够正常地进行电力供应及电力保障。35kV及以下配电设备安装和交接实验在实际设置过程中需要注意各种各样的问题,保证安装效果和安装效率。 In order to ensure the normal and stable operation of the electrical system,the handover test must be carried out after the installation of the power distribution equipment,and the normal power supply and power guarantee can be carried out only if the test results are good.The installation and handover test of 35kV and below power distribution equipment needs to pay attention to various problems during the actual setting,so as to ensure the installation effect and installation efficiency.
作者 马金迎 MA Jin-ying(Xiamen Yongfucheng Electric Power Engineering Co. Ltd.,Xiamen 361000,China)
出处 《中小企业管理与科技》 2019年第23期176-177,共2页 Management & Technology of SME
关键词 35kV 配电设备 安装 交接试验 35kV distribution equipment installation handover test
  • 相关文献

同被引文献2

引证文献1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部