2Jean Muller. Some Recent International Projects with External Prestressing[ J ]. AFPC External Prestressing in Structures,France. 1993:71 - 83. 被引量:1
3Godart B. Strengthening prestressed concrete box girder bridges: the French experience [J]. Structural Engineering International. 1995(2) :81 -84. 被引量:1
4Virlogeux M P. External Prestressing - From Construction History to Modern Technique and Technology, External Prestressing in Bridges[SO]. ACI sp - 120,1990. 被引量:1
5Muller J. Construction of Long Key bridge[J]. PCI Journal,1980(6) :97 - 111. 被引量:1
6Azez Hindi, Robert Macgregor, etc. Enhancing the Strength and Ductility of Post - Tensioned Segmental Box Girder Bridge [J]. AFPC External Prestressing in Structures, France. 1993:153 - 162. 被引量:1
7American Concrete Institute. External prestressing in bridges [M]. ACI Special Publication SP2120. Detroit, MI, 1990.. 被引量:1
8Straninger W, Wicke M. Bridge strengthening with additional prestressing [J]. Structural Engineering International. 1995(2) :78 -80. 被引量:1
9Falkner H, Huang Z,Teufsh M. Strengthening bridges with unbonded prestression[J]. Structural Engineering International. 1995(2) :76 -77. 被引量:1
10Tan K H, Ng C H. Effects of deviators and tendon configuration on behavior of externally prestressed beams [ J ]. ACI Structural Journal, 1997,94 ( 1 ): 13 - 22. 被引量:1