摘要
为解决目前600MW机组TSI安装调试技术应用过程存在的问题,本文从实践角度出发,在分析TSI安装调试技术的应用现状的基础上,提出了实践控制的方法对策。以期能为相关建设者提供一些理论参考。
In order to solve the problems existing in the application process of TSI installation and Commissioning Technology for 600 MW units, this paper puts forward practical control methods and Countermeasures Based on the analysis of the application status of TSI installation and commissioning technology from a practical point of view. In order to provide some theoretical reference for the relevant builders.
作者
张洋
Zhang Yang(Shanxi Zhangdian Datang Tashan Power Generation Co., Ltd., Shanxi Datong 037000, China)
出处
《电气传动自动化》
2019年第2期51-52,共2页
Electric Drive Automation
关键词
600MW机组
TSI安装调试技术
现场标定
探头安装
600MW unit
TSI installation and commissioning technology
field calibration
probe installation