期刊文献+

考虑能耗和准时的混合流水线多目标调度 被引量:9

Multi-Objective Hybrid Flow-Shop Scheduling Problem Considering Energy Consumption and On-Time Delivery
下载PDF
导出
摘要 针对加工时间和交货期模糊的混合流水线,考虑阶段内并行机互不相关、换模时间与工件加工次序相关等约束,面向降低生产能源消耗和保证准时交货的双目标调度问题,提出一种改进型差分进化算法.首先,以最小化系统能耗和准时交货惩罚为优化目标建立双目标优化数学模型;在此基础上,使用NEH(Nawaz, Enscore, Ham)方法获得优质初始解,并利用优质解挑战机制进行有效的邻域挖掘;同时,引入混沌搜索策略以保证算法的全局搜索能力;最后,将数值实验与有代表性的算法的计算结果进行对比,以验证所提算法的可行性与有效性. To guarantee on-time delivery of the hybrid flow-shop system and reduce energy consumption at the meantime, a modified differential evolution algorithm is proposed for the multi-objective hybrid flow-shop scheduling problem with fuzzy processing time and due date, considering in-stage unrelated parallel machines and sequence-dependent setup time. First, a bi-objective mathematical model is established to minimize on-time delivery penalty and energy consumption. Then, a modified algorithm is developed which efficiently generates high-quality initial solutions with NEH(Nanaz, Enscore, Ham)-based heuristic method, thoroughly exploits neighborhoods with the elite individual challenging mechanism. The modified algorithm highly improves the exploration ability with chaotic search strategy. Finally, the results of the comparison with existing typical algorithms and numerical experiment demonstrate that the proposed algorithm is feasible and effective.
作者 周炳海 刘文龙 ZHOU Binghai;LIU Wenlong(School of Mechanical Engineering, Tongji University, Shanghai 201804, China)
出处 《上海交通大学学报》 EI CAS CSCD 北大核心 2019年第7期773-779,共7页 Journal of Shanghai Jiaotong University
基金 国家自然科学基金资助项目(71471135)
关键词 混合流水线调度 差分进化算法 模糊 不相关并行机 换模时间 hybrid flow-shop scheduling differential evolution algorithm fuzzy unrelated parallel machine setup time
  • 相关文献

参考文献2

二级参考文献36

  • 1崔建双,李铁克,张文新.混合流水车间调度模型及其遗传算法[J].北京科技大学学报,2005,27(5):623-626. 被引量:29
  • 2轩华,唐立新.实时无等待HFS调度的一种拉格朗日松弛算法[J].控制与决策,2006,21(4):376-380. 被引量:25
  • 3王凌.车间调度及其遗传算法[M]北京:清华大学出版社,2003. 被引量:1
  • 4SALVADOR M S. A solution of a special class of flow shop scheduling problems[A].Beilin:Springer-Verlag,1973.83-91. 被引量:1
  • 5ORTMANN M C,VIGNIER A,DARDILHAC D. Branch and bound crossed with GA to solve hybrid flowshops[J].European Journal of Operational Research,1998,(02):389-400. 被引量:1
  • 6SOEWANDI H,ELMAGHRABY S E. Sequencing on two-stage hybrid tlowshops with uniform machines to minimize makespan[J].IIE Transactions,2003,(05):467-477. 被引量:1
  • 7FIGIELSKA E. A genetic algorithm and a simulated annealing algorithm combined with column generation technique for solving the problem of scheduling in the hybrid flow shop with additional resources[J].Computers & Industrial Engineering,2009,(01):142-151. 被引量:1
  • 8RIANE F,ARTIBA A,ELMAGHRABY S E. Sequencing a hybrid two-stage flow shop with dedicated machines[J].International Journal of Production Research,2002,(17):4353-4380. 被引量:1
  • 9XIAO W;HAO P;ZHANG S.Hybrid flow shop scheduling using genetic algorithms[A]上海:IEEE,2000537-541. 被引量:1
  • 10LOW C. Simulated annealing heuristic for flow shop scheduling problems with unrelated parallel machines[J].Computers and Operations Research,2005,(08):2013-2025. 被引量:1

共引文献34

同被引文献80

引证文献9

二级引证文献17

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部