摘要
施工导流是工程施工组织设计的重要组成部分,对整个工程具有重大意义。文章结合工程水地质条件和工程段施工导流目的,确定了适合该工程的导流方案,采用全断面围堰法导流方式,辅助导流采用明渠导流。并且按照标准要求,通过计算,获取了围堰、明渠断面设计,以及施工截流和基坑排水具体实施方法。
Construction diversion is an important part of engineering construction organization design and is of great significance to the whole project.In this paper,combined with the engineering water geological conditions,combined with the construction diversion purpose of the engineering section,the diversion scheme suitable for the project is determined,and the full-section cofferdam method is adopted to guide the flow,and the auxiliary diversion is guided by the open channel.According to the standard requirements,through the calculation,the design of the cofferdam and open channel section as well as the concrete implementation method of construction interception and foundation pit drainage are obtained.
出处
《科技创新与应用》
2019年第25期91-92,共2页
Technology Innovation and Application
关键词
施工导流
施工组织
全断面围堰法
明渠导流
construction diversion
construction organization
full face cofferdam method
open channel diversion