期刊文献+

井下移动变压器故障分析及解决方案研究 被引量:1

Research on Fault Analysis and Solution of Underground Mobile Transformer
下载PDF
导出
摘要 煤矿供电系统一般包括地面变电、井下中央变电所、采取变电所三部分。采取变电所一般采用可移动式变压器将中央变电所的6~10 kV电压变为0.4~3.3 kV电压,供给井下大型设备使用。对井下移动变压器的常见故障进行分析和研究,以STM32作为控制核心,设计故障检测与诊断硬件系统,利用CAN总线通讯,实现数据远程传输。 The coal mine power supply system generally consists of three parts: ground substation, underground central substation, and substation.The substation will generally use a movable transformer to convert the 6~10 KV voltage of the central substation to 0.4~3.3 KV, which will be used by large underground equipment. The common faults of underground mobile transformers were analyzed and studied. STM32 was used as the control core to design the fault detection and diagnosis hardware system, and CAN bus communication was used to realize remote data transmission.
作者 任吉文 REN Ji-wen(Yang Coal Group I Mine Mechanical and electrical area mine repair team,Yangquan 045000,China)
出处 《机电工程技术》 2019年第7期199-201,共3页 Mechanical & Electrical Engineering Technology
关键词 煤矿 移动变压器 硬件设计 故障分析 coal mine mobile transformer hardware design fault analysis
  • 相关文献

参考文献7

二级参考文献8

共引文献22

同被引文献8

引证文献1

二级引证文献3

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部