摘要
采用层次分析的方法,通过建立分歧性结构模型,计算输变电工程安全文明施工费投入权重比例。根据模型计算结果,讨论输变电工程安全文明施工费使用并加以优化,以提高安全文明施工费的使用效率。
Using the method of analytic hierarchy process,the weight ratio of safety and civilized construction cost of power transmission and transformation project is calculated by establishing divergent structure model. According to the calculation results of the model,the safe and civilized construction cost of power transmission and transformation project is discussed and optimized to improve the efficiency of safe and civilized construction cost.
作者
梁扬滨
LIANG Yang-bin(State Grid Fujian Electric Power Co.,Ltd.,Shishi Power Supply Company,Shishi 362700,China)
出处
《通信电源技术》
2019年第7期203-206,共4页
Telecom Power Technology
关键词
输变电工程
层次分析法
安全文明施工费
power transmission and transformation project
analytic hierarchy process
safe and civilized construction cost