摘要
以铜玉铁路工程的隧道施工监测项目为研究对象,介绍了各监测要素的监控内容、技术要求及实施方法,并对相应的监测结果进行对比分析,归纳监测数据的变化规律,进而推断各监测要素的变化情况,以期为此类项目的实施及数据分析提供借鉴,为类似工程设计和施工优化提供参考。
Based on the tunnel construction monitoring of Tongyu railway engineering project as the research object,this paper introduces the monitoring contents,each monitoring elements of the technical requirements and implementation methods,and the corresponding monitoring results were compared and analyzed,summarized changes of monitoring data,and then infer the changes of the monitoring elements.Through the introduction of this article,it is expected to provide reference for the implementation and data analysis of such projects,and to provide reference for similar engineering design and construction optimization.
作者
张俊仁
ZHANG Junren(Beijing Fudi Investigation and Surveying Co.Ltd.,Beijing 100124,China)
出处
《测绘与空间地理信息》
2019年第7期185-189,共5页
Geomatics & Spatial Information Technology
关键词
隧道施工
监控量测
拱顶下沉
净空收敛
地表沉降
数据分析
tunnel construction
monitoring measurement
crown settlement
headroom convergence
ground subsidence
data analysis