上海市申旺路519号10#楼在项目中期附加了预制装配式外挂混凝土夹心保温墙板施工,其单个构件尺寸为4 175 mm×3 700 mm,最大自重达7.4 t,是施工中的难点。通过采用汽车吊多点位协同组合吊装,并结合地下室顶板"永临结合"多维综合加固、高精度安装、容差调整等措施,成功地完成了预制挂板吊装施工,取得了良好的社会与经济效益。
A precast external hanging concrete sandwich insulation wall panel construction was added in the middle stage of the 10# building project at No.519, Shenwang Road, Shanghai. Its single component size is4 175 mm×3 700 mm and its maximum self-weight is up to 7.4 t, which is a difficult point in construction. Through the adoption of multi-position coordinated hoisting of truck crane, combined with the measures of "permanent-temporary combined" multi-dimensional comprehensive reinforcement of basement roof, high-precision installation and tolerance adjustment, the precast hanging panel hoisting construction was successfully completed, and satisfying social and economic benefits were obtained.
作者
王瑛
WANG Ying(Shanghai Construction No.4 (Group) Co., Ltd., Shanghai 201103, China)
出处
《建筑施工》
2019年第6期1070-1072,1076,共4页
Building Construction
关键词
预制挂板
装配式施工
多维加固
容差调整
precast hanging panel
prefabricated construction
multi-dimensional reinforcement
tolerance adjustment